Interior demolition/removal of hydraulic lifts and other equipment from vehicular repair facility, clean and abandon oil reservoirs, prepare site for use by new occupant.
Conduct repairs to irrigation system at research facility.
Repair 350 linear feet of shoreline, remove existing riprap, install geotextile, additional riprap and plant mangroves. Restore eroded walkways by installing liner and geogrid.
Increase lagoon capacity by raising banks, replace liner, install new drainage system and lift station, install perimeter fencing.
Slab installation.
Construct dams at two backcountry canals to prevent saltwater intrusion inland.
Repair main gate and installation of 4 light posts.
Conduct interior/exterior repairs/renovations.
Biscayne Bay Aids to Navigation (ATON) Replacement
Removal of damaged ATON piles and replacement of damaged markers in Biscayne Bay at the Featherbed and Pelican Banks.
Boca Chita Erosion Control Measures
Installation of xxxx ft of sand fence, lay xxx SF of biodegradable erosion control blanket, and xx SF of BESE degradable mats. Plant 1700 native plants on land and shoreline. Maintain structures and water plants for one year.
Conduct cyclic maintenance on xx administration and support buildings (xx Total surface area) for the Everglades National Park, including exterior cleaning, waterproofing, miscellaneous repairs and painting.
DeSoto National Monument
Install new xx linear feet (LF) communications and fiber optic line between maintenance area and visitors center using trenching and directional boring methods. Connect visitors center to phone service.
Big Cypress National Preserve
Install 6 culvert sections along xxxx Rd to increase natural surface water flow in area.
Reinforce concrete crossing to allow passage of heavy equipment to work area without disrpting flow though tidally influenced stream.
Gate automation and security upgrades Install xx L F of fiberoptic cable, install CCTV and access controls, connect to existing security system.
Renovation of various historical buildings at research station.
Demolition of various prefabricated structures. Conduct asbestos and hazardous material surveys, maximize reciclable content of waste streams.
Repair and seal Xx LF of site roads.